Warning: file_get_contents(../../../wp-includes/general-template.php): Failed to open stream: No such file or directory in /home/u121488396/domains/gtbventures.com/public_html/wp-content/plugins/acunetix3/acunetix.php on line 25

Deprecated: Optional parameter $userId declared before required parameter $envId is implicitly treated as a required parameter in /home/u121488396/domains/gtbventures.com/public_html/wp-content/plugins/ai-engine/classes/modules/files.php on line 346

Deprecated: Optional parameter $purpose declared before required parameter $envId is implicitly treated as a required parameter in /home/u121488396/domains/gtbventures.com/public_html/wp-content/plugins/ai-engine/classes/modules/files.php on line 346

Deprecated: Optional parameter $metadata declared before required parameter $envId is implicitly treated as a required parameter in /home/u121488396/domains/gtbventures.com/public_html/wp-content/plugins/ai-engine/classes/modules/files.php on line 346
Sea Rose - villas
sea-rose-villa
sea-rose-villa

Inspired by Balinese Architecture

Sea Rose Villas is a comfortable club complex of luxury villas based upon the principles of environmental sustainability, family values and safety. The project is made up of 6 villas: two-storey, which are ideal for both relaxation and everyday life.

architecture-sea-rose Sea Rose

The complex is located in the north of Goa, in a village called Siolim, with stunning views of coastal paddies. Just fifteen minutes away from your new villa there are five gorgeous beaches, several hospitals and all the necessary infrastructure.

luxury-villas
Luxury
Villas
convenient-location
Convenient
Location
quality-construction
Quality
Construction
unparalleled
Unparalleled
Aesthetics Catering
to Privacy
house-pool
our-work-sea-rose-2
our-work-sea-rose-3
our-work-sea-rose-4

Sales Office

  • gold-location JQ6G+V4H Duler-Marna-Siolim
    Rd,Marna, Siolim, Goa 403507
  • gold-phone +91 79827 29098
  • gold-envelope info@gtbventures.com

    DEVELOPMENT PROGRESS

    1. Design stage and preparation for construction

    The project concept is developed, all tender drawings are prepared, consultations are held with engineers and experts in green building construction.

    06.2021 — 06.2022

    2. Receipt of documents and tender

    Collection and Submission of documents for a construction permit. Tender for the main contractor is held.

    07.2022 — 08.2022

    3. Construction

    The project is constructed, starting with a pit and finishing with the villas. We will be publishing progress photos during the construction.

    09.2022 — 06.2024

    4. Preparation for moving in

    Finishing touches and set up of common areas, preparation for commissioning the villas.

    07.2024 — 08.2024

    5. Post-Construction phase

    Preparation is done for the ownership transfer and associated documentation.

    08.2024 — 09.2024

    6. Owners are moving in

    Welcome to your new home!

    10.2024

    Contact Us

    Fill out the form for any queries or get a quote for our
    services.

      whatsapp.png